SECTION 02520 – ASPHALT PAVEMENT PART 1 - GENERAL: 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division 1, Specification Sections, apply to work in this section. 1.2 DESCRIPTION OF WORK:
Get PriceSECTION 02520 - SLURRY SEAL PART I - GENERAL 1.01 WORK INCLUDED Work on this Section includes placement of slurry seal on roadways, streets, and parking lot areas. 1.02 RELATED REQUIREMENTS A. Section 01340, “Submittals” B. Section 02500, “Paving and Surfacing” C. Section 02510, “Crack Sealing” D. Section 02580, “Traffic Striping ...
Get PriceC. Concrete Pavement: Select concrete paving materials as specified in Section 02520 D. Asphalt Pavement: Select asphaltic paving materials as specified in Section 02513 2.02 CONDUIT SYSTEM A. Non-Metallic Conduit: a. PVC plastic pipe, ASTM D1785, Schedule 40 or 80 Type PVC 1120
Get PriceE. Section 02520, “Slurry Seal ... C. Planing Asphalt Concrete Pavement 1. Planed asphalt concrete pavement will be measured by thesquare footor square yard per specified width. The quantity to be paid for will be the actual required area of surface planed irrespective of the number of passes required.
Get Price02520 Asphalt Pavement 02520-3 DIVISION 3 – CONCRETE (Not Used) DIVISION 4 – MASONRY (Not Used) DIVISION 5 – METALS (Not Used) 135-13914-16001-02 Pages Thru Table of Contents TOC-2 07/2018 DIVISION 6 – WOOD AND PLASTICS (Not Used) ... B Reference is made to Section 01010, Summary of Work,for the identification of
Get PriceSection 01580 - Traffic Signals Section 02200 - Earthwork Section 02210 - Embankments Section 02225 - Earthwork for Structures and Pipelines Section 02520 - Cement Concrete Curb, Gutter, and Combined Curb and Gutter Section 02522 - Cement Concrete Sidewalks, Driveways, and Median Pavement Section 02580 - Pavement Markings
Get PriceSECTION 02520 - SLURRY SEAL PART I - GENERAL 1.01 WORK INCLUDED Work on this Section includes placement of slurry seal on roadways, streets, and parking lot areas. 1.02 RELATED REQUIREMENTS A. Section 01340, “Submittals” B. Section 02500, “Paving and Surfacing” C. Section 02510, “Crack Sealing” D. Section 02580, “Traffic Striping ...
Get Price02520 - 1 Portland Cement Concrete Paving SECTION 02520 PORTLAND CEMENT CONCRETE PAVING PART 1 – GENERAL 1.01 DESCRIPTION A. This Section includes specifications for constructing concrete curb, gutter and sidewalk, concrete base, concrete pavement, and curb ramps at the locations and to the dimensions
Get PriceC. Concrete Pavement: Select concrete paving materials as specified in Section 02520 D. Asphalt Pavement: Select asphaltic paving materials as specified in Section 02513 2.2 CONDUIT SYSTEM A. Non-Metallic Conduit: 1) PVC plastic pipe, ASTM 01785, Schedule 40 or 80, Type PVC 1120
Get PriceSection 02520 – Concrete Curb and Gutter Section 02522 – Concrete Walks, Driveways, and Ramps Section 02580 – Pavement Markings Section 03300 – Concrete Formwork, Reinforcement and Materials Subdivision Street Design Standards and Specifications 1.3 Applicable Specifications A. American Society for Testing and Materials (ASTM).
Get PriceSection 02520, Base and Leveling Courses for Paving and Surfacing.....2 pgs. Section 02530, Asphalt Concrete (AC) Pavement .....17 pgs. Section 02585, Pavement Markings, Legends and Bars (Thermoplastic) .....2 pgs. DIVISION 3, CONCRETE
Get PriceSection 01600 - Equipment and Materials. Section 01631 - Substitutions. Section 01780 - Contract Closeout. Section 02100 - Clearing and Grubbing. Section 02110 - Removal of Existing Improvements. Section 02200 - Earthwork. Section 02254 - Sheeting and Shored Excavations. Section 02300 - Trench Excavation and Backfill.
Get PriceAsphalt pavement used for a local collector street. Asphalt pavement used at a transit bus stop. Asphalt pavement used at an industrial facility. Traffic Class 4 Traffic Class 4 is the heaviest duty traffic class considered in this guide and would accom-modate up to approximately 200 trucks per day in the traffic stream. Applications meeting this
Get Price1. All layers of asphalt pavement shall be spread with an asphalt paver and shall conform to Section 39-6.02. 2. At locations where the asphalt pavement is to placed over areas inaccessible to spreading and rolling equipment, all layers of asphalt pavement shall be distributed directly out of the back of the dump truck and spread by hand.
Get Pricesection 02520 storm drainage and appurtenances section 02540 erosion control . section 02616 pavement removal and replacement section 02821 grassing section 03300 concrete, general . advertisement for bids ... 10 312 sy 1.5" asphalt topping 11 500 lf silt fence 12 1 ls temporary grassing ...
Get PriceAsphalt Pavement Limerock Base Course 1-3 Painting Traffic Stripes 1-4 Section 00015 Section 00100 Section 00110 Section 00120 Section 00130 Section 02110 Section 02200 Section 02210 Section 02211 Section 02500 Section 02505 Section 02510 Section 02516 Section 02518 Section 02520 Asphalt Testing 1-2 DOCUMENTS Document No. 1
Get Priceeradication of conflicting pavement markings for Maintenance of Traffic purposes, milling and resurfacing scarred pavement is required. Pavement scarring during MOT could include friction course and/or shoulder pavement. Notwithstanding, the Design Build teams are still responsible for any damages requiring repair, under Specification 7-11.
Get Price2012 201 E. 5th Street • Gillette, WY 82716 • 307.686.5265 gillettewy.gov Standard Construction Specifications City of Gillette Engineering Division
Get Price201 E. 5th Street • Gillette, WY 82716 • 307.686.5265. 2009 Standard Construction Specifications . ci.gillette.wy.us CITY OF GILLETTE ENGINEERING DEPARTMENT
Get PricePermeable pavement . Pervious concrete, porous asphalt, permeable pavers, or other forms of pervious or porous paving material intended to allow passage of water through the pavement section. It often includes an aggregate base that provides structural support and acts as a stormwater reservoir.
Get PriceC. Concrete Pavement: Select concrete paving materials as specified in Section 02520 D. Asphalt Pavement: Select asphaltic paving materials as specified in Section 02513 2.2 CONDUIT SYSTEM A. Non-Metallic Conduit: 1) PVC plastic pipe, ASTM 01785, Schedule 40 or 80, Type PVC 1120
Get PriceThis section covers the work for the construction and /or rehabilitation of hot-mix hot-laid, asphalt pavements, gravel pavements, sidewalks and walkways, curb and gutter, culverts, subdrains and other surface works. RELATED WORK (Strike out those which are inappropriate.) Section 02520 – Excavation and Grading. Section 02530 – Landscaping
Get Price02520 Asphalt Pavement 02520-3 DIVISION 3 – CONCRETE (Not Used) DIVISION 4 – MASONRY (Not Used) DIVISION 5 – METALS (Not Used) 135-13914-16001-02 Pages Thru Table of Contents TOC-2 07/2018 DIVISION 6 – WOOD AND PLASTICS (Not Used) ... B Reference is made to Section 01010, Summary of Work,for the identification of
Get Pricesection 02520 portland cement concrete pavement SECTION 02528 CONCRETE CURB, COMBINED CURBS AND GUTTERS SECTION 02530 CONCRETE SIDEWALKS, DRIVEWAY APPROACHES, CURB RETURN FILLETS, VALLEY GUTTERS AND MISCELLANEOUS NEW CONCRETE CONSTRUCTION
Get Pricesection 02520 8 process sanitary and storm sewer pipes and precast monholes and catch basins section 02612 3 asphalt pavement section 02614 5 concrete paving section 02620 2 concrete sidewalks, curbs and gutters section 02630 4 walks section 02713 15 water distribution system ...
Get Pricesection 02520 storm drainage and appurtenances section 02540 erosion control . section 02616 pavement removal and replacement section 02821 grassing section 03300 concrete, general . advertisement for bids ... 10 312 sy 1.5" asphalt topping 11 500 lf silt fence 12 1 ls temporary grassing ...
Get Priceeradication of conflicting pavement markings for Maintenance of Traffic purposes, milling and resurfacing scarred pavement is required. Pavement scarring during MOT could include friction course and/or shoulder pavement. Notwithstanding, the Design Build teams are still responsible for any damages requiring repair, under Specification 7-11.
Get PriceA. Asphalt concrete for paving the designated area shall be Class C2-AR-4000 hot-plant mix and shall conform to the requirements of SSPWC Section 203-6, Asphalt Concrete. B. Asphalt content in the pavement shall be 5.5 percent to 6.0 percent by weight. Asphalt concrete (AC) paving shall conform to III-C2-AR-4000 as defined in SSPWC, Subsection ...
Get PriceThe Asphalt Pavement Association of Oregon is a non-profit trade association representing contractors and associated firms. APAO was formed in 1969 by a small group of asphalt paving contractors to develop improved specifications and products. The Association and its members are dedicated to promoting asphalt pavements by developing pro-
Get PriceJan 01, 2021 PAVEMENT DRIVEWAY STANDARDS Civil Std. Description: File Type CP-13 Concrete Pavement Details Precinct 1 3 (2 Sheets) pdf: dwg CP-24 Concrete Pavement Details Precinct 2 4 (2 Sheets) pdf: dwg DMRC Driveway Details for Major Roadway Construction pdf: dwg CD-3 Commercial Driveway Details Precinct 3 ...
Get PriceA. Place temporary pavement as specified herein except where otherwise required by jurisdictional requirements. 1. Place and compact hot mix asphalt bituminous concrete mix minimum thickness of 3 inches and at same grade as surrounding surface on Trench Backfills required in Section 02315 for Type I areas under existing paving. 2.
Get Price• Existing asphalt pavement core gradations. • Percentage of asphalt content in the asphalt pavement cores taken. 3.2.3 Subbase/Subgrade Sample Classification Samples should be obtained from all layers expected to be reclaimed (asphalt, subbase, and possibly subgrade). The depth of sampling should be 1.5 times the depth of pulverization. The
Get PriceSection 02075 – Demolition of Asphalt and Portland Cement Concrete... 3 IX. Section 02110 ... Section 02227 – Backfilling for Pavement..... 7 XIX. Section 02231 – Aggregate Sub-base and ... Section 02520 Portland Cement Concrete Pavement..... 8 XXVII. Section 02528 ...
Get PriceThe pavement heaving problem in North Runway, found during 2000- 2003, had created a number of pavement distress, including debonding and slippage cracks, and resulted with extensive patch repairs ...